For the evacuation of the former ammunition depot in Mitholz, the current plant must be shut down in advance. Even when decommissioned, a power supply is required. This requires the construction of a new transformer station. The planned construction of the supply line (Elektro and Swisscom), divided into 8 stages, extends from the existing transformer station (618,102, 152,907) over a total length of approx. 475 m and crosses under the Rotbach twice. In addition, a slope cut is necessary for the two boreholes, which are intended to enable the power supply inside the plant. The excavation pit is secured by a nail wall. The wells will be procured in a separate process and are not part of the tender.
(cf. document "C1 performance description Mitholz new transformer station")
For the evacuation of the former ammunition depot in Mitholz, the current plant must be shut down in advance. Even when decommissioned, a power supply is required. This requires the construction of a new transformer station. The planned construction of the supply line (Elektro and Swisscom), divided into 8 stages, extends from the existing transformer station (618,102, 152,907) over a total length of approx. 475 m and crosses under the Rotbach twice. In addition, a slope cut is necessary for the two boreholes, which are intended to enable the power supply inside the plant. The excavation pit is secured by a nail wall. The wells will be procured in a separate process and are not part of the tender.
(cf. document "C1 performance description Mitholz new transformer station")