242 General renovation GS Königsbrunn-Nord BA 2 with hoard - 242-1170-01 Painting work BA2
96 m Protecting linear luminaires by masking
60 m² surface protection with PE film
142 m² of suspended ceilings
Cleaning 123 m² of concrete walls of formwork oil, etc.
142 m² primer of ceilings for painting work
38 m² initial coating on walls, wet abrasion class 1
130 m² initial coating on reinforced concrete walls
142 m² initial coating on GK ceilings, wet abrasion class 2
180 m² closing of screed joints from floor to wall
280 m² base and top coat floor, dust-binding
180 m² base and top coat, vertical, H = 100 cm
Cleaning 1059 m² drywall walls from sanding dust
1059 m² primer of wall surfaces
223 m² primer of soffits for painting work
1059 m² Spatula of walls made of GK or concrete, Q3
1059 m² initial coating on walls, wet abrasion class 1
224 m² initial coating on wall ends, window and door frames, up to 25cm
250 m² initial coating on GK ceilings, wet abrasion class 2
230 m² base and top coat floor, dust-binding
140 m² base and top coat, vertical, H = 100 cm