The assignment consists of the establishment of a sewage pipeline from Yssimoen to Myrer, length 2 700 m.
A water pipeline for NRV will be established in the same ditch.
NRV delivers pipes and pipe parts for water.
Parts of the route shall be carried out by directional drilling.
The total length is approx. 300 m divided between two drillings.
The main part of the route goes through agricultural land.