construction project
Extension to the secondary school tom-Brok-Straße. The extension is being built directly on the existing building. It is a three-storey building. The following constructions are planned:
Founding: Deep foundation
Exterior wall: Rear masonry / insulation / facing or partially (subordinate) curtain wall façade
Roof structure: reinforced concrete ceiling / vapour barrier / insulation / waterproofing
- 100 m galvanized flat strip
- 100 m underground cable made of stainless steel V4A rd 10 mm
- 50 roof cable holders
- Lightning protection testing