Federal Ministry of the Interior, Construction and Home
Extension building Moabiter Werder (EMW)
Flooring work — DIN 18365
The cavity floors of the office and meeting rooms in the high-rise are covered with a durable textile floor covering made of needlework. In the area of storage rooms and copy rooms in the ground floor and in the skyscraper, as well as in the tea kitchens and the attached communication rooms, the cavity floor is covered with linoleum. In the area of the non-removable raised floor strip in the hallway area of the 1st floor to 12th floor skyscraper, a durable textile floor covering made of needlework is also provided.
— area of needle fleece on cavity floor approx. 5 400 m
— area of needley on raised floor strips approx. 640 m
— area of linoleum approx. 600 m
The planned implementation period is from 29.5.2023 to 22.5.2024.
Binding individual deadlines.