Extended shell construction with excavation pit shoring, foundation and building construction as well as window work.
- Baugrubenverbau 220 m²
- Excavation pit excavation and soil replacement 3,000 t
- Underground pipes and shafts
- Reinforced concrete walls, in-situ concrete 2500 m²
- Reinforced concrete ceilings, in-situ concrete 6100 m²
- Masonry 4000 m²
- Vapor barrier roof incl. primer 1,000m²
- Plastic windows with interior and exterior window sill 328 pcs.
- Façade awning 173 pcs.