The order includes the planning services, specialist planning, technical equipment in accordance with Part 4 Section 2 HOAI AG 1-6 and 8-9 for the renovation of the Bienwald Stadium in Kandel. It is planned to commission LPH 4-9 in sections and in stages.
The city of Kandel intends to award the planning services, specialist planning, technical equipment in accordance with Part 4 Section 2 HOAI AG 1-6 and 8-9 for the renovation of the Bienwald Stadium in Kandel. The planned measure includes the renovation of the stadium building and the grandstand as well as the redesign of the sports area. among others, the following are provided:
- new heat generator, heat distribution, hot water distribution, heating surfaces - renewal of sanitary installations - new piping, sanitary objects, softening system, sprinkler system,
- new ventilation system, regulation, insulation of the ducts - low voltage installation,
- lighting system general lighting, outdoor lighting floodlights LED - lighting stadium building outside, mast lights for general. Lighting and Escape routes areas
- lightning protection system,
- Search u. Signaling systems,
- time service systems,
- sound system,
- TV u. Antenna system - Hazard detection system u. Alarm systems,
- Transmission networks, new elevator building stadium building (existing building), renovation ground floor 428.29 sqm GFA upper floor 245.26 sqm GFA new construction of competition office 20.49 sqm NUF, speaker cabin 6.25 sqm NUF framework dates: Start of planning services immediately after commissioning Construction start as soon as possible after approval of the requested grant. According to the current state of knowledge, the construction costs amount to cost group 400 approx. EUR 761 773.75 (gross) Therein KG 410 approx. 108 171.00 EUR KG 420 approx. 158 032.00 EUR KG 430 approx. 71 519.00 EUR KG 440 approx. 238 910.25 EUR KG 450 approx. 79 671.50 EUR KG 460 approx. 90 000.00 EUR KG 490 approx. 15 470 EUR.