The KOE Rostock intends to set up a temporary building at the Maxim-Gorki-Str. 67-69 location in Rostock.
Food supply to the existing school through a container construction. The temporary solution will be
centrally placed on the renewed driveway of the property.
The schoolyard is directly adjacent to the construction site. It is necessary to constantly ensure that the children of the school are directly
play next to the construction site and accordingly all necessary precautions must be taken.
The planned provisional building consists of a one-storey building with two emergency exits.
The access to the construction site is via the Maxim-Gorky Straße road.
The service description includes the complete delivery and ready-to-use assembly of a steel system building made of prefabricated room modules.
Production and assembly must be carried out in accordance with the specifications according to a high quality standard. The prefabricated room modules are manufactured and newly manufactured in Germany with a view to services.