Renovation and modernisation of the Friedrich-Engels-Gymnasium 2nd phase - Lot 2.17 Air conditioning, ventilation
Ventilation installation
1 pc ventilation unit V total 5,000 m3/h
2 St Kleinraumventilator
2 St PPs Dachventilator
3 pcs decentralised ventilation units
2 St Küchenablufthaube
1 St Warmwasserheizregister Kanaleinbau
3 St Kanaleinbaugitter
1 St Wetterschutzgitter
3 St Rauchdichtes Überströmventil
3 built-in parts (silencer, fire damper, etc.)
300 m2 of duct material and insulation
Cold installation
1 VRV outdoor unit incl. accessories
3 wall-mounted refrigeration units incl. accessories
50 m refrigeration piping up to DN 25