1. Public contract in the open tender procedure referred to in Article 132 of the Act of 11 September 2019 Public procurement law (Journal of Laws of 2022, item 1710), hereinafter referred to as the PPL Act.
2. This contract is a classic contract within the meaning of Article 7(33) of the PPL.
3. The value of the contract exceeds the EU thresholds within the meaning of Article 3(1)(1) of the PPL.
IV. Description of the order item:
1. The subject of the order is construction works consisting in the execution of:
• Repair of the bridge over the river Uherka in the town of Uherka Rudka along the provincial road No. 816
km 102+010
CPV code: 45111000-8 Demolition works, earthmoving
45233000-9 Construction, foundation and foundation works
paving motorways and roads
45221000-2 Construction work for bridges and tunnels, shafts
and underground railway
Order description:
1. The subject of the order is construction works consisting in the execution of:
• Repair of the bridge over the river Uherka in the town of Uherka Rudka along the provincial road No. 816
km 102+010
CPV code: 45111000-8 Demolition works, earthmoving
45233000-9 Construction, foundation and foundation works
paving motorways and roads
45221000-2 Construction work for bridges and tunnels, shafts
and underground railway
2. Scope of works:
Demolition robots.
As part of the renovation of the bridge, the following demolition work must be carried out:
- dismantling the balustrades,
- dismantling the road surface on the bridge,
- milling the surface on the approach,
- demolition of reinforced concrete caps,
- demolition of the cornice of the bearing system,
- forging the upper surface of the plate of the carrying system,
- dismantling the wings of the abutment,
- dismantling the reinforcement of the cones,
- demolition of slope sewage,
- demolition of slope stairs,
- demolition of the remaining formwork of the pillar benches.
Scope of bridge works.
As part of the bridge repair, the following works will be done:
- preparatory works,
- earthworks,
- insertion of reinforcing sheet piles
- repair of damage to the surface of bridge supports along with reprofiling and protection of concrete surfaces,
- injection of cracks in the abutments
- restoration of the wings,
- reconstruction of back walls,
- making a leveling layer of the existing reinforced concrete slab made of reinforced concrete,
- cleaning and corrosion protection of steel beams of the carrying system,
- reinforcement of steel beams
- execution of expansion joints in the form of surface stretching,
- execution of modular expansion joints on the connection of the system - abutment.
- light insulation protection of concrete surfaces in contact with the ground,
- execution of transition plates,
- waterproofing of the carrying system,
- execution of elements of drainage of the bearing system slab,
- setting curbs on the object
- setting curbs on the commutes,
- setting protective barriers on the facility and access roads,
- execution of measuring points,
- restoration and repair of cone fortifications,
- restoration and repair of slope sewage,
- reconstruction of slope stairs,
- strengthening of slopes near the object,
- clearing and strengthening the area under and within the bridge.
- strengthening the watercourse.