Renovation of Merkel'sches Schwimmbad Esslingen:
The GFA is approx. 3,000 m² and the BRI 12,000 m³.
The following measures are to be carried out as part of the upcoming renovation:
- Complete renovation of the sports pool and the indoor swimming pool
- Renewal of the technical equipment
- fire protection upgrading
- Barrier-free access
The work will be carried out from September 2023 to December 2024.
The lift equipment:
- 2 * Elevator - hydraulically operated 1 hp