Sewage treatment plant Dresden-Kaditz, renewal / replacement of CHP A and B
- Engineering services for technical equipment according to HOAI 2021 Part 3 § 55, work phases 2 to 9
- Determination of the fee for all focal points listed in the task under point 6
Sewage treatment plant Dresden-Kaditz, renewal / replacement of CHP A and B
The existing CHP units A and B are central elements of the self-supply of electricity to the Dresden-Kaditz sewage treatment plant. When the 90,000 Bh is reached, the general overhaul is necessary. In this context, the cost-effectiveness of the general overhaul must be compared with that of a replacement measure or new acquisition. In the task under point 6, the main areas of processing are listed conclusively, in addition, the fee is to be offered for the service profile technical equipment (HOAI 2021 Part 3 § 55) for the service phases 2 to 9.