The purpose of the procedure is to provide inspection and safety coordination services for the works of: Pedestrian walkway along the right bank of the Cávado River between the Barcelos riverfront and the Quinta do Brigadeiro area - 1st phase (OC98C) and Connection to the EN103 bypass, in Rio Covo S.ta Eugénia (OC59B)
Pedestrian walkway along the right bank of the Cávado River between the Barcelos riverfront and the Quinta do Brigadeiro area - 1st Phase (OC98C)Provision of supervision and safety coordination services for the construction of a pedestrian walkway along the right bank of the Cávado River between the Barcelos riverfront and the Quinta do Brigadeiro area - 1st phase (OC98C).
Connection to the EN 103 bypass, in Rio Covo Sta. Eugénia (OC59B)Provision of inspection and safety coordination services for the contract for the connection to the EN103 bypass, in Rio Covo S.ta Eugénia (OC59B)