Central-heating installation work | Tenderlake

Central-heating installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 August 2023
Closing Date:
05 October 2023
Location(s):
DE DEUTSCHLAND (DE Germany/DEUTSCHLAND)
DE2 BAYERN (DE Germany/DEUTSCHLAND)
DE21 Oberbayern (DE Germany/DEUTSCHLAND)
DE216 Bad Tölz-Wolfratshausen (DE Germany/DEUTSCHLAND)
Description:
Heizanl. u. centr. Wassererwärmungsanl.

1 pc district heating transfer station 610 KW

approx. 5,125 m black steel pipe for heating DN 15 to DN 100

approx. 220 pcs radiators

approx. 1,203 m2 underfloor heating

1 pc Liquid-cooled chiller indoor installation 380 KW

2,329 m black steel pipe for cold water DN 15 to DN 150

heater

approx. 1 pcs district heating transfer station 610 KW

approx. 1 pcs heating manifold (volume flow 14 m3/h)

approx. 13 pcs circulating pumps (glandless)

approx. 5,125 m black steel pipe for heating DN 15 to DN 100

ca. 362 pc. Fittings

approx. 13 heat meters QN 1.5 m3/h to 20 m3/h with spacer

approx. 220 pcs radiators

approx. 1,203 m2 underfloor heating

approx. 267 m Thermal insulation Heating pipes DN 15 to DN 80 Mineral wool

Refrigeration:

approx. 1 pc. Liquid-cooled chiller indoor installation 380 KW

approx. 1 pcs dry dry dry cooler, outdoor installation 454 kW

approx. 1 pcs refrigeration distributor (volume flow 60 m3/h)

approx. 6 pcs circulating pumps (glandless)

approx. 2,329 m black steel pipe for cold water DN 15 to DN 150

ca. 280 pcs fittings

approx. 6 heat meters QN 1.5 m3/h to 60 m3/h with spacer

Air recirculation cooling units:

approx. 7 circulating air cooling units 1.0 to 1.6 kW

approx. 70 pcs cooling ceiling sails (power 109 W/m2)

Insulation of refrigeration pipes:

approx. 236 m cold insulation refrigeration pipes DN 15 to DN 150 synth. Rubber

Download full details as .pdf
The Buyer:
Staatliches Bauamt Weilheim
CPV Code(s):
45331100 - Central-heating installation work