General renovation of the Schyren Gymnasium Pfaffenhofen ad Ilm
1-025-03_Malerarbeiten THREE 4
700 m2 painting of concrete walls, ceilings and columns
300 m2 painting of plastered walls
500 m2 painting of sand-lime brick exposed masonry
1600 m2 painting drywall
3000 m2 painting drywall ceilings perforated/ smooth
60 pcs Painting Steel Enclosure Frames
1-025 Painting BA 4
1-025-03_Malerarbeiten THREE 4
700 m2 painting of concrete walls, ceilings and columns
300 m2 painting of plastered walls
500 m2 painting of sand-lime brick exposed masonry
1600 m2 painting drywall
3000 m2 painting drywall ceilings perforated/ smooth
60 pcs Painting Steel Enclosure Frames