New school center elementary and middle school in Odelzhausen, 2nd construction phase, with 27 classrooms and common areas such. B. Teachers and administrative area, auditorium, art spaces, music and science.
Dietenhausener Strasse 17, 85235 Odelzhausen
BRI 47.951.89 m
BGF 10,867.20 m
Building 3 storey plus 2 basement floors
Construction site equipment AN and AG
Railing escape balcony
Consisting of steel railing post h = 1.30 m
And wood lamella 140 * 60mm, silver fir h = 3.40 m: about 490 pcs
Handrail and skirting board with stretched rope net: approx. 200 m
Gratings outside and inside
partly with substructure: approx. 45 m
Grating stairs with platform, 11 STG: approx. 2 pcs.
Full glass railing inside: approx. 30 m
Banisters inside
Flat steel balustrade: approx. 90 m
Screed angle: approx. 250 m
Hourly wage work