The renovation includes blasting/felting of the entire bottom of the paddling pool and the construction of
Terrazzo. Next to the pond, shafts and the construction of a new shower plate in concrete will be carried out. The existing shower should be removed and a new 2-pillar shower should be fitted.
Furthermore, the paddling pool lacks accessibility adaptations. The assignment therefore includes the construction of an accessible ramp in site-cast concrete. Ramp and associated supervisors should be designed according to Stockholm- A City for All (SESFA) and Technical Handbook (TH).
The contract includes a ready-to-swim facility according to the City of Stockholm's guidelines for pond bathing.
The renovation includes blasting/felting of the entire bottom of the paddling pool and the construction of
Terrazzo. Next to the pond, shafts and the construction of a new shower plate in concrete will be carried out. The existing shower should be removed and a new 2-pillar shower should be fitted.
Furthermore, the paddling pool lacks accessibility adaptations. The assignment therefore includes the construction of an accessible ramp in site-cast concrete. Ramp and associated supervisors should be designed according to Stockholm- A City for All (SESFA) and Technical Handbook (TH).
The contract includes a ready-to-swim facility according to the City of Stockholm's guidelines for pond bathing.