Building yard civil engineering office, modernization and extension, earthworks and concrete works as well as penstock work outside buildings
- Shell construction as a concrete structure with floor slab, basement, ground floor and attic floor
- Floor slab, WU in-situ concrete, D=30cm 80 cbm
- Walls, in-situ concrete, D=20-30cm 560 sqm
- Floor slabs, precast concrete filigree slabs with
Concrete, D=25cm 245 sqm
- Soil improvement by vibrating tamping columns, D = 60cm 650 m
- Verbauauffüllungen 170 cbm
- Pipeline work in the course of the shoring fillings 640 m