The scope of this Contract is to reinforce the existing gas supply to the Irish interconnector through the construction and commissioning of a high pressure gas pipeline and ancillary elements in parallel with the existing single pipeline connecting Cluden Block Valve to Brighouse Bay Compressor Station.