Installation of measurement and control technology
1. I&C work in secondary school;
- Extension of the existing I&C system in the secondary school by a heating circuit;
2. I&C work in the Hauptschule;
- 107 pieces of field equipment (heating and ventilation technology);
- Automation focus (ASP 01) consisting of a control cabinet 800 x 2000 x 400 mm in room U.06.2 building services;
- Automation focus (ASP 02) consisting of three control cabinets 800 x 2000 x 400 mm in room 3rd floor room 3.04;
- 1 piece control cabinet for surge protection 800 x 2000 x 400 mm in room 3rd floor room 3.04;
- 13780 running meters electrical cables for internal wiring;