New construction of the Geisenfeld secondary school with triple sports hall - VE33500 panel façade;
Construction site equipment 1.00 psch;
Plan of construction site equipment and schedule 1.00 psch;
Assembly, workshop and installation planning, detailed planning and calculations 1.00 psch;
Metal substructure 2,150.00 m²;
Thermal insulation mineral fibre 2,150.00 m²;
Wind seal thermal insulation 2,150.00 m²;
Perimeterdämmung 160,000 m²;
Perimeter insulation plinth, balcony 110,000 m²;
Wall surfaces covered with fibre cement panels 2,150.00 m²;
Window and door reveals 1,445.00 m;
Aluminum window sills 615,000 m;
Brandbarriere / Brandsperre 1.150,00 m;
Inspection doors, w/h=30/30 cm 12.00 pcs;
Inspection doors, w/h=40/60 cm 10.00 pcs;
triangular or square wrench 2.00 pcs;
External thermal insulation composite system mineral wool d=40 mm with reinforcement 250.00 m²;
Working scaffolds 4,200.00 m²;
Stair towers 4,000 pcs;
Dachfanggerüste 225,000 m;
see II. 1.4