Engineering services | Tenderlake

Engineering services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
06 December 2022
Closing Date:
09 January 2023
Location(s):
DEC01 Regionalverband Saarbrücken (DE Germany/DEUTSCHLAND)
Description:
Conversion and renovation of the existing building with extension of the former Mozart School to a special school (lot 3)

The Regional Association Saarbrücken (client) intends to award planning services for the conversion and renovation of the existing building with extension of the former Mozart School to the Special School for Intellectual Development, work phases 1 to 6 of the performance profile of the structural design according to § 51 HOAI in conjunction with Annex 14.1 to the HOAI.

The construction project is planned on the site of the Mozartschule Dudweiler.

Due to increasing numbers of pupils from year to year, the special school G "Am Winterbachsroth", Saarbrücken-Dudweiler, has changed its space requirements. In spring 2021, planning for the reorganization and expansion of the site has already begun. The Mozart School in Dudweiler, which is currently still let, offers itself as a new location due to an existing property with appropriate infrastructure and a large, largely flat property.

The conversion can be carried out parallel to the teaching activities of the school "Am Winterbachsroth".

In addition to the need for additional classrooms with directly adjoining differentiation rooms, rooms for voluntary all-day school/afternoon care have also become necessary. Due to its floor plan structure (classrooms already available), the existing Mozartschule property offers the division of the large rooms into one classroom with adjoining differentiation room. Additional sanitary facilities are to be built on each floor, as well as workshops, specialist rooms and storage facilities in the basement. In a two-storey extension, two further classrooms and function rooms (sports, therapy, teaching kitchen, kitchen, dining room) are planned. A meeting possibility for internal school events is desired. In order to ensure accessibility, an external elevator is to be built in conjunction with a foyer between the old and new buildings. In the outdoor area, a playground with play and exercise facilities as well as a covered stop for the school buses is planned. The car and bicycle parking spaces required by licensing law must be taken into account when preparing the building application.

The following dates and deadlines are planned:

- Start of planning: immediately after commissioning

- Start of construction: 01.04.2024

- Completion: 30.09.2026

Download full details as .pdf
The Buyer:
Regionalverband Saarbrücken
CPV Code(s):
71300000 - Engineering services