Scheduling, planning, coordination (OPC), digital model management (BIM) and synthesis services for the MY3 project at the Toulon naval base.
Scheduling, planning, coordination (OPC), digital model management (BIM) and synthesis services for the MY3 project at the Toulon naval base. The contract will be composed of the following items:
- BIM synthesis new buildings (firm and optional tranche),
- BIM synthesis renovated buildings (optional tranche),
- BIM management and modifications of digital models (firm and optional tranche) optional),
- OPC Studies and works on new buildings MY3-II (firm and optional tranche),
- OPC Studies and works renovated buildings MY3-II (firm and optional tranche),
- OPC studies and works ASDEM AMIP (firm and optional tranche),
- Reversibility option (optional slice).
The contract will include a BPU item relating to the conversion of the site into 3*8 new buildings (optional tranche).