The service covered by this CLA is subdivided into 2 main distinct lots, chronologically sequential: a "firm" lot (known as a pre-CDR) and an "optional" lot (known as a post-CDR).
The "firm" batch includes the definition and detailed design phases of the "GSE Laser" as well as the identification and launch of the supply of LLI (long lead items). Among the possible LLIs, iodine cells have been identified.
The "optional" batch (the launch of which is conditional on the success of the CDR) includes the manufacture/supply of the laser system that is the subject of this CCT.
A third and final optional batch dedicated to maintenance completes the service.
Toulouse Space Center