Cluster 4 Extended shell - two half-timbered buildings to be renovated - one new building
Half-timbered buildings - Renovations: gutting, demolition measures, renewal in some areas
200 m2 of concrete floor and ceilings 100 m2, plastering work inside 1000 m2, plastering and
Exterior slurry work 1000 m2 , screed work 1200 m2, installation of steel beams 4000 kg,
Mauerarbeiten 300 m2
New construction: earthworks backfills 800 m3, concrete floor slab 180 m3, in-situ concrete ceilings 220 m3,
2-shell exterior masonry with veneer 650 m2, interior masonry 750 m2, plaster work
1400 m2, screed work 650 m2