Summary of work and construction work:
Lot 1:
1 St construction site equipment
1 pc Preservation of evidence
Clearing and clearing 170 m² of planting area
Pick up 190 m³ of bitumen cover, dispose of it
Dismantle and dispose of 690 m² of paving area
Dismantle 320 m of edge stone, dispose of it
Pick up 50 m drainage channel, dispose of it
18 pcs Pick up pole lights, dispose of them
1 pc dismantling bicycle canopy approx. 25x5 m
380 m³ Loosen floor Z1/Z1.1 and Z1.2, dispose of
495 m³ Loosen floor Z2, dispose of
Loosen and dispose of 65 m³ of underbody
Pick up and store 45 m³ of topsoil
and reinstall
Supply and install 160 m³ of topsoil
Construct 3,000 m² of path surface
2,200 m² Removing and reinstalling base courses
2,600 m² of paved areas with
Supplying, creating base courses
Supply, create 270 m² of asphalt/mastic asphalt
430 m of curbs/curbs, installation
1 pc Supplying and installing the shed
Deliver and install 16 boulders
Supplying and installing 10 m L-bricks
Pull and lay 700 m of pipe trenches and pipes
90 m supply and installation of drainage channels
5 pcs yard inlet deliver, install
9 pcs Mounting/sewer shafts deliver, install
115 m fence 1.80 m supply, assemble
Deliver and install 3 pcs gate systems
Create 730 m² of flat surface and sow the lawn
14 pcs Delivering trees, planting
970 pcs Hedge plants supply, plant
660 St Shrubs supply, plant
6180 pcs Perennials and ground cover plants supply, plant
2 years completion/warranty maintenance
Lot 2:
14 pcs benches, different lengths supply/install
3 pcs Deliver/install waste bins
7 pcs Cutting down trees
47 pcs supply/install bike racks
2 pcs table tennis tables supply/install
1 pc in-ground trampoline supply/install
3 pcs hammock supply/install
1 pc Supply/install climbing facility
100 m² Supply/install synthetic fall protection surface
200 m² wood chips as ground cover under trees
1 pc first acceptance play area
The following services are part of the facilities:
- outdoor facilities
- Playground equipment, benches, fall protection, bicycle racks, etc.