District-heating mains construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 April 2021
Closing Date:
24 May 2021
Location(s):
DE122 Karlsruhe, Stadtkreis (DE Germany/DEUTSCHLAND)
Description:
District heating Rheinstrandsiedlung, lots 8.2, 8.3, 9 and 10

Civil engineering and pipeline construction as well as surface restoration for a district heating distribution line with outgoing house connections in Karlsruhe, Rheinstrandsiedlung district.

District heating Rheinstrandsiedlung Lot 8.2

Civil engineering, pipe construction. and restoration work for the new installation of a district heating distribution line and 2 house connections with MSR in the Schmetterlingweg Rheinterstrandsiedlung.

Cable length and dimension:

— KMR pipe DN 65 ca 110 m,

— KMR pipe DN 40 ca 46 m,

— KMR pipe DN 32 ca 16 m

— MSR 24 x 7 /1x14 ca 55 m

— MSR 1 x 7 mm approx 60 m

Pipe material is provided by the AG.

District heating Rheinstrandsiedlung Lot 8.3

Civil engineering, pipe construction and restoration work for the new installation of a district heating distribution line and 2 house connections with MSR in the Rhine beach settlement Grillenweg.

Cable length and dimension:

— KMR pipe DN 65 ca 180 m,

— KMR pipe DN 32 approx 67 m

— MSR 24 x 7/1 x 14 ca 90 m

— MSR 1 x 7 mm approx 67 m

Pipe material is provided by the AG.

District heating Rhine beach settlement Lot 9

Civil engineering, pipe construction and restoration work for the new installation of a district heating distribution line and six house connections with MSR in the Falterweg district of Rheinstrandsiedlung.

Length and dimension of the line:

Weidenweg distribution line:

— path length 118.15 m (236.3 m plastic casing pipe in DN100 (200) including fittings, 4 x expansion joints DN100,

— MSR Speedpipe® composite pipe 24x7/1x14 length 118.15 m.

butterfly path 1-3:

— path length 15.5 m (31 m plastic casing pipe in DN32 (110) including fittings. MSR Speedpipe® 2 x 7 x 1.5 track length 15.5 m

Butterfly Trail 4-6:

— path length 16 m (32 m plastic casing pipe in DN32 (110) including fittings. MSR Speedpipe® 2 x 7 x 1.5 path length 16 m

butterfly trail 8-10:

— Track length 27.5 m (55 m plastic casing pipe in DN32 (110) including fittings. MSR Speedpipe® 2 x 7 x 1.5 track length 27.5 m

Poplar Avenue 16:

— Track length 24 m (28 m plastic casing pipe in DN32 (110) including fittings. MSR Speedpipe® 2 x 7 x 1.5 path length 16 m

Weidenweg 1-5:

— path length 42.5 m (85 m plastic casing pipe in DN32 (110) including fittings. MSR Speedpipe® 2 x 7 x 1.5 track length 42.5 m

District heating Rhine beach settlement Lot 10

Civil engineering. - Pipeline construction and restoration work for the new installation of a district heating distribution line and six house connections with MSR in Weidenweg in the district of Rheinstrandsiedlung.

Length and dimension of the line:

Weidenweg distribution line:

— path length 290.5 m (581 m plastic casing pipe in DN100 (200) including fittings, 6 E expansion joints DN100,

— MSR Speedpipe® composite pipe 24x7/1x14 length 290.5 m.

Weidenweg 7-11:

— path length 48.4 m (96.8 m plastic casing pipe in DN32 (110) including fittings. Installation MSR Speedpipe® 2 x 7 x 1.5 track length 48.4 m

Weidenweg 17-19:

— path length 33.9 m (67.8 m plastic casing pipe in DN32 (110) including fittings. MSR Speedpipe® 2 x 7 x 1.5 path length 33.9 m

Weidenweg 21-23:

— 33 m (66 m plastic casing pipe in DN32 (110) including fittings. MSR Speedpipe® 2 x 7 x 1.5 Track Length 33m

Butterfly Trail 5-9:

— 31.9 m (63.8 m plastic casing pipe in DN32 (110) including MSR Speedpipe® 2 x 7 x 1.5 path length 31.9 m.

Download full details as .pdf
The Buyer:
Stadtwerke Karlsruhe Netzservice GmbH
CPV Code(s):
45232140 - District-heating mains construction work