Roads and highway works required for the construction of the future workshop, major overhauls of the CTS's Kibitzenau deposit and demineralization of the deposit
The contract includes the construction of the connections of the building's networks to the external networks, road works peripheral to the building, the recovery of rainwater, the extension of the storage cover and demineralisation works.
The overall volume is estimated at:
- Earthworks: 1200 m3
- Road reprofiling: 1870 m²
- Supply and installation of grass or permeable paving stones: 2,660m²
- Supply and installation of DN ≤200 manifold: 250ml
- Realization of prefabricated or cast-in-place concrete blocks of all sizes for all equipment: 42u
- Creation of green spaces: 5480m²
The contract includes the construction of the connections of the building's networks to the external networks, road works peripheral to the building, the recovery of rainwater, the extension of the storage cover and demineralisation works.
The overall volume is estimated at:
- Earthworks: 1200 m3
- Road reprofiling: 1870 m²
- Supply and installation of grass or permeable paving stones: 2,660m²
- Supply and installation of DN ≤200 manifold: 250ml
- Realization of prefabricated or cast-in-place concrete blocks of all sizes for all equipment: 42u
- Creation of green spaces: 5480m²