Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 May 2022
Closing Date:
25 May 2022
Location(s):
DE DEUTSCHLAND (DE Germany/DEUTSCHLAND)
DE8 MECKLENBURG-VORPOMMERN (DE Germany/DEUTSCHLAND)
DE80 Mecklenburg-Vorpommern (DE Germany/DEUTSCHLAND)
DE80J Mecklenburgische Seenplatte (DE Germany/DEUTSCHLAND)
Description:
Framework agreement for fiber optic cable pulling, cable splicing and commissioning work 2022 – 2024, lots 1 - 4, on behalf of neu-medianet GmbH

Framework contract fibre optic cable pulling, cable splicing and commissioning work 2022 – 2024, lots 1 - 4, on behalf of neu-medianet GmbH Lot 1 - House connection Blow-in work Lot 2 - House connection Completion and commissioning Lot 3 - Main cable Blow-in work Lot 4 - Main cable Splicing work It is planned to agree uniform individual prices for all contractors (CONTRACTOR). They shall apply equally to all AN of the respective lot. The aim is to conclude a contract with a maximum of five CONTRACTORS for lots 1 + 2, for lots 3 + 4 with a maximum of two AN. The area of application is limited to the district of MSE. Maximum permitted travel time to the main place of performance (reaction time) is 1.5 hours.

Lot 1 - House connection blow-in work

Lot 1 - House connection Blow-in work Fibre optic house connection cable A total of approx. 1,300 house connections have to be blown in.

The quantities listed in the specifications correspond to the services to be provided in 24 months. The services are to be provided continuously in equal parts from the day of the award. The aim is to conclude a contract with a maximum of five contractors

Lot 2 - House connection Completion and commissioning

Lot 2 - House connection Completion and commissioning A total of approx. 1,000 house connections have to be put into operation.

The quantities listed in the specifications correspond to the services to be provided in 24 months. The services are to be provided continuously in equal parts from the day of the award. The aim is to conclude a contract with a maximum of five contractors

The 3 - Hauptkabel Einblasarbeiten

Lot 3 - Main cable Blow-in work Approx. 300,000 m of fiber optic cable have to be pulled in or blown into the micro cable protection tube.

The quantities listed in the specifications correspond to the services to be provided in 24 months. The services are to be provided continuously in equal parts from the day of the award. The aim is to conclude a contract with a maximum of two contractors.

The 4 - Hauptkabel Spleißarbeiten

Lot 4 - Main cable Splicing work The lot includes splicing work to be carried out in existing NVTs and sockets as well as in sockets to be mounted.

The quantities listed in the specifications correspond to the services to be provided in 24 months. The services are to be provided continuously in equal parts from the day of the award. The aim is to conclude a contract with a maximum of two contractors

Download full details as .pdf
The Buyer:
neu-medianet GmbH
CPV Code(s):
45000000 - Construction work
45231000 - Construction work for pipelines, communication and power lines