Renovation and new construction of the existing bathing hall Inzell
Installation of heating systems
1 biomass boiler 330 kW, for burning pellets or wood chips, with individual fuse
2 gas boilers each 370 kW with individual fuse
1 stainless steel fireplace system for solid boilers
1 stainless steel fireplace system for gas boilers
2 buffer storage tanks per 6,000 liters
1 Anlagengesamtabsicherung
3 heating distributors with approx. 4 heating circuits each
approx. 14 heating circuit superstructures with shut-offs, mixer and pump
7 heating circuit connections to ventilation and bath water heating
with barriers, pump and mixer
approx. 1000 m² underfloor heating
approx. 600 m heating pipes made of steel pipes DIN 2448 / DIN EN 10216-1, DN 125 to DN 65
und Gewinderohren DIN 2440 / DIN EN 10255, Rohrgrößen 50 bis DN 15