Mechanical and electrical engineering services | Tenderlake

Mechanical and electrical engineering services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 March 2019
Closing Date:
08 April 2019
Location(s):
DE715 Bergstraße (DE Germany/DEUTSCHLAND)
Description:

Performances of technical equipment "Elektro" according to §§ 53 ff. HOAI 2013, Lph. 1-9, groups of equipment 4, 5, 6 and 8, gradual retrieval, first performance phases 1 and 2.



New construction of the sports hall "Altrheinhalle" (ARH) as well as previous demolition of the existing construction site.

Performances of the technical equipment "Elektro" according to §§ 53 ff. HOAI 2013, Lph. 1-9, groups of units 4, 5, 6 and 8, gradual retrieval, first performance phases 1 and 2 ..

The project is currently in preliminary planning. The new building concept is created on the basis of the preliminary draft of the architect and worked through until the submission of the building application. The commissioning of the specialist planners takes place in parallel, initially in stages for the Lph 1-2.

The new construction of the sports hall includes a gross floor area (A) of approx. 3,000 sqm.

The planned energy and technology concept should follow the premises of sustainability in order to optimize future maintenance costs. The summer heat protection is particularly important.

The following requirements are, among other things, part of the electrical planning that is advertised here:

Connection of fire alarm system to the existing campus operation.

Connection ELA system to the existing campus operation.

Connection telephone and data technology to the existing campus operation.

Connection building management computer to the existing campus operation.

Connection of power supply and supply PV to existing substation or new supply building.

Connection of media counter to the existing meter management.

Adjusting the exterior lighting.

Revisible cable routes in the outdoor area with cable rewinding options.

The structural implementation of the measure described here starts with the demolition of the inventory on the construction site during the ongoing school operation.

Noise-intensive work should be carried out as far as possible in the Hessian school holidays or lessons.

More information:

BGF demolition stock on the construction site: about 10 000 sqm

BGF new construction approx. 3,000 sqm

Costs of new construction including demolition: approx. EUR 6 million

Download full details as .pdf
The Buyer:
Schule + Gebäudewirtschaft – Eigenbetrieb des Kreises Bergstraße
CPV Code(s):
71334000 - Mechanical and electrical engineering services