Roofing work
Brief description of the measure:
Flat roof and waterproofing work for a new school building, here only 1st construction phase.
Scope of services Main items:
Mineralwoll-Gefälledämmung 790m²
FPO-Dachabdichtung 790m²
extensive greening 640m²
Substructure for 156 pcs PV modules
Rope safety system 195 running meters
Roof exit 120/150cm
Main and emergency drainage 14 pcs
Rainfall pipes 48lfm
Waterproofing Stb base plate with bitumen welding membrane 670m²
Execution times:
Technical clarification: within 4 weeks after placing the order
Roof work, attic etc.: 26.06. - 01.09.2023
Surface sealing base plate, in advance small areas: 31.07. - 12.08.2023
Surface sealing base plate (shortly before screed): 20.11. - 02.12.2023