Water-well drilling | Tenderlake

Water-well drilling

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
13 December 2021
Closing Date:
07 January 2022
Location(s):
CH0 SCHWEIZ/SUISSE/SVIZZERA (CH Switzerland/SCHWEIZ/SUISSE/SVIZZERA)
Description:
Creation of withdrawal well, EB1 and EB2 Badusstrasse

The IBC energy center on Badusstrasse includes groundwater extraction for thermally used groundwater. achievements:

• Creation of two sampling wells with a capacity of 3600 l/min each. Drilling depth 72m, drilling diameter >=1000mm.

• Desanting.

• pumping tests.

cf. Technical Basics Chapter F and Supplement 2

The IBC energy center on Badusstrasse includes groundwater extraction for thermally used groundwater. achievements:

• Creation of two sampling wells with a capacity of 3600 l/min each. Drilling depth 72m, drilling diameter >=1000mm.

• Desanting.

• pumping tests.

cf. Technical Basics Chapter F and Supplement 2

Download full details as .pdf
The Buyer:
IBC Energie Wasser Chur
CPV Code(s):
45120000 - Test drilling and boring work
45121000 - Test drilling work
45122000 - Test boring work
45255500 - Drilling and exploration work
45262220 - Water-well drilling