As part of the second construction phase, the old pool facilities in the outdoor pool in Schlitz will be replaced by new, durable stainless steel pool constructions, material 1.4404. The renovation is carried out under the idea of inclusion.
As part of the renovation of the Schlitz outdoor swimming pool, a diving facility with 1 1 m board, 3 m platform and a 5 m platform will be built in the 2nd BA.
Technical description:
Jumping facility according to DIN EN 13451-
- 5 m platform with round column and platform in hot-dip galvanized design including GRP covering as well as railings and ladder made of stainless steel
- 3 m platform with round column and platform in hot-dip galvanized design including GRP covering as well as railings and ladder made of stainless steel
- 1 m springboard system with round column and platform in hot-dip galvanized design as well as railings and ladder made of stainless steel, with glass fiber springboard, roller adjustment device and springboard repository
- Static calculation
Sprunganlage