The College is seeking Contractor(s) for the supply, delivery and installation of technical equipment as well as of benching requirements for their New Campus Building Project in Inverness.
The new campus facilities house a range of technical workshops, for which equipment is required. Due the wide range of equipment needed, the requirement has been split into 14 (fourteen) lots.
Lot 1 — Benching
Lot 2 — Motor Vehicle Workshop
Lot 3 — Engineering
Lot 4 — Mechanical Engineering
Lot 5 — Building Technology
Lot 6 — 3D Printer and Scanner
Lot 7 — Joinery
Lot 8 — Plumbing
Lot 9 — Student Lathes
Lot 10 — Engineering & Building Technology
Lot 11 — CNC Machining
Lot 12 — Electrical
Lot 13 — Pan Mixer
Lot 14 — Fabrication Equipment.