The contract includes the object planning of buildings and interiors acc. Part 3 Sect. 1 HOAI, planning of open spaces acc. Part 3 Section 2 HOAI for the new construction of the municipal construction yard in Kandel, Lph 4-9. The city of Kandel intends to relocate the municipal construction yard to the industrial estate on Lauterburger Straße on the outskirts of the city. At the new location, the main building of the building yard u. a warehouse will be built.
Overall, the planned construction measures approximately 1,730 sqm NGF: Fahrzeughallenbereich: 637 sqm
Social construction (changing rooms, wet rooms, social rooms, and offices): about 205 sqm EC / 169 sqm
OG workshop and storage area (workshop wood and metal, hazardous materials warehouse, storage area): about 172 sqm EC / 179 sqm
Upper floor warehouse: approx. 369 sqm.
Framework dates: Start of planning services immediately after commissioning Start of construction as soon as possible after approval of the requested subsidy Construction costs
KG 200, 17 850.00 EUR
KG 300, 2 171 452,50 EUR
KG 400, 404 957,00 EUR
KG 500, 598 570.00 EUR
The contract includes the object planning of buildings and interiors acc. Part 3 Sect. 1 HOAI, planning of open spaces acc. Part 3 Section 2 HOAI for the new construction of the municipal construction yard in Kandel, Lph 4-9. The city of Kandel intends to relocate the municipal construction yard to the industrial estate on Lauterburger Straße on the outskirts of the city. At the new location, the main building of the building yard u. a warehouse will be built.
Overall, the planned construction measures approximately 1,730 sqm NGF: Fahrzeughallenbereich: 637 sqm
Social construction (changing rooms, wet rooms, social rooms, and offices): about 205 sqm EC / 169 sqm
OG workshop and storage area (workshop wood and metal, hazardous materials warehouse, storage area): about 172 sqm EC / 179 sqm
Upper floor warehouse: approx. 369 sqm.
Framework dates: Start of planning services immediately after commissioning Start of construction as soon as possible after approval of the requested subsidy Construction costs
KG 200, 17 850.00 EUR
KG 300, 2 171 452,50 EUR
KG 400, 404 957,00 EUR
KG 500, 598 570.00 EUR