Painting work required for the construction of a three-course secondary school with a two-field sports hall.
- coating walls approx. 10000 m²
- Cleaning sand and concrete protection walls approx. 4500 m²
- coating ceilings approx. 300 m²
- GK acoustic ceiling coating approx. 3400 m²
- primer floors approx. 275 m²
- coating steel frames various Sizes approx. 75 pieces