Solar photovoltaic modules | Tenderlake

Solar photovoltaic modules

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 December 2022
Closing Date:
31 January 2023
Location(s):
PL71 Łódzkie (PL Poland/POLSKA)
Description:
Renewable energy sources in the Białaczów Commune

The subject of the contract is the design, delivery and assembly of photovoltaic installations in the Białaczów Commune, which is implemented as part of the project "Renewable energy sources in the Białaczów Commune".

The design, delivery and assembly of photovoltaic installations in the Białaczów Commune includes, in particular:

1) development of design documentation (obtaining decisions of the architectural and construction administration body required by law, including: notification of construction works, building permit, if required and other decisions, permits, arrangements, notifications required by law),

2) delivery and assembly based on the technical documentation prepared by the Contractor of 197 sets of photovoltaic installations, together with the construction adapted to the place of assembly in the municipality of Białaczów,

3) execution in each location, no later than 40 days after signing the contract with the Ordering Party, of an inventory of buildings from which Protocols of Assembly Arrangements signed by the Residents will be drawn up, on the basis of which the design documentation will be prepared,

4) delivery and assembly of structures for PV modules,

5) delivery and assembly of brand new, not older than 2022 PV modules,

6) delivery and assembly of brand new DC/AC inverters not older than 2022,

7) excavation in the ground to the required depth,

8) laying cable routes, grounding and cables from PV panels to the inverter and wires from the inverter to the electrical switchboard,

9) installation of switchgear for photovoltaics (DC and AC side) along with earthing of the installation (the value of earthing resistance should reach <10 Ohm),

10)wyposażenie rozdzielnicy DC (ochronnik przeciwprzepięciowy, rozłącznik bezpiecznikowy DC)

11) AC switchgear equipment (fuse disconnector, surge protector, circuit breaker)

12) performing installation tests and checking the proper operation of the apparatus,

13) system activation and adjustments,

14) measurements of electrical installations required by relevant regulations,

15) configuration of all inverters, connection to the User's Internet network (in the absence of a permanent Internet connection at the location of the inverter, the costs of providing coverage are covered by the User, in the case of a complete lack of Internet network for the User, the requirement is to equip the User with a module that allows future connection to the Internet.) and integration with one system to monitor energy production, environmental benefits and control of photovoltaic installations from the system level. The system must be available for stationary and mobile devices on the iOS and Android platforms, devices monitoring the operation of the system should be able to communicate with a dedicated server on which the intended data will be saved,

16) training of facility managers and users in the operation and use of photovoltaic installations made under this procedure,

17) preparation of notification documentation together with notification of connection of microinstallations to the power grid of the regional DSO,

18) making the necessary mounting holes and culverts to introduce devices,

19) sealing of mounting holes and culverts after introduction.

The detailed scope of work to be performed by the Contractor of the contract is described in the PFU, which constitutes (Annex 1 to the SWZ) an integral part of the SWZ.

Attention:

The PFU indicates the design and implementation of delivery, assembly and commissioning of the installation:

- pellet boilers 29 pcs.

- photovoltaic installations 195 pcs.

These proceedings cover only the design and execution of the delivery, assembly and commissioning of photovoltaic installations in the amount of 197 pcs. , but does not include the design and implementation of delivery, assembly and commissioning of the installation 29 pcs. pellet boilers.

Download full details as .pdf
The Buyer:
Gmina Białaczów
CPV Code(s):
09300000 - Electricity, heating, solar and nuclear energy
09331100 - Solar collectors for heat production
09331200 - Solar photovoltaic modules
45300000 - Building installation work
45310000 - Electrical installation work
45311200 - Electrical fitting work
45315300 - Electricity supply installations
45317300 - Electrical installation work of electrical distribution apparatus
45330000 - Plumbing and sanitary works
45332200 - Water plumbing work
71320000 - Engineering design services