Construction site traffic management (3+1) incl. 3 connection points for a total of 1 year of construction time Manufacture, maintain, operate, dismantle
4 times reconstruction of the traffic routing over the entire length
Construction, operation and dismantling of a temp. traffic light system at a junction for the entire construction period
6 times full lock at one connection point for 10 days each
23.600 lfm yellow marking (CSP) + 34.600 lfm yellow marking foil; 15cm & 30cm in several sections
30,000 running metres white marking 15cm, 30cm & 50cm in several sections
300 m H1/W7 protective wall
18,300 m T3W2 Protective Wall
Construction site traffic management (3+1) incl. 3 connection points for a total of 1 year of construction time Manufacture, maintain, operate, dismantle
4 times reconstruction of the traffic routing over the entire length
Construction, operation and dismantling of a temp. traffic light system at a junction for the entire construction period
6 times full lock at one connection point for 10 days each
23.600 lfm yellow marking (CSP) + 34.600 lfm yellow marking foil; 15cm & 30cm in several sections
30,000 running metres white marking 15cm, 30cm & 50cm in several sections
300 m H1/W7 protective wall
18,300 m T3W2 Protective Wall