The assignment is for the transport, spread and temporary storage of the fertiliser product Ecopro 2. Ecopro 2 is a result of digestion of approx. 50 % food waste and 50 % sewage sludge, as well as some fish and slaughter waste.
The assignment is for the transport, spread and temporary storage of the fertiliser product Ecopro 2. Ecopro 2 is a result of digestion of approx. 50 % food waste and 50 % sewage sludge, as well as some fish and slaughter waste.