Energy efficiency Complex projects: Low-carbon district heating supply of the future - transformation of district heating network in Pirna
Lot 2.3: dismantling 31 existing FW house connection stations; delivery and installation and commissioning of 31 new FW house connection stations
Lot 2.3 Exchange of 31 district heating compact stations, indirect connection, TWWB 2-stage flow principle, RL cooling from the primary side heating RL, connected load 150 - 1,400 kW; connection to the existing FW supply, building heating system, hot and cold water distribution, circulation; approx. 1,250 lfdm. piping incl. insulation