The contract provides for the doubling of the shed for the storage of cellulose, in the M+K area of the Port of Livorno. In particular, it requires the mirror construction of the existing structure (built, with prefabricated structures in reinforced concrete, c.a.p. and c.a.v.), moved by about 20 meters, in order to access the two sides of the shed from the central corridor that will be realized as better specified in the drawings of the final project and in the list of works of the Special Tender Specifications.
The contract provides for the doubling of the shed for the storage of cellulose, in the M+K area of the Port of Livorno. In particular, it requires the mirror construction of the existing structure (built, with prefabricated structures in reinforced concrete, c.a.p. and c.a.v.), moved by about 20 meters, in order to access the two sides of the shed from the central corridor that will be realized as better specified in the drawings of the final project and in the list of works of the Special Tender Specifications.