'- Works management work (new construction and relocations)
- Road construction (new construction, concrete roundabout and temporary structures)
- Engineering structures (retaining walls, small animal passage)
- Excavation: 22,300 m3
- Kiessand: 8'600 m3
- bituminous coverings (incl. temporary coverings): 2,200 t
- Betonkreisel: 1'500 m2
- Finishes: 955 m
- Inlet shafts: 24 pcs.
- Inspection shafts: 24 pcs.
- Entwässerungsleitungen: 1'800 m
- Concrete: 470 m3
- Armouring: 62 t
- Indicative performance: CHF 3.9 million
'- Works management work (new construction and relocations)
- Road construction (new construction, concrete roundabout and temporary structures)
- Engineering structures (retaining walls, small animal passage)
- Excavation: 22,300 m3
- Kiessand: 8'600 m3
- bituminous coverings (incl. temporary coverings): 2,200 t
- Betonkreisel: 1'500 m2
- Finishes: 955 m
- Inlet shafts: 24 pcs.
- Inspection shafts: 24 pcs.
- Entwässerungsleitungen: 1'800 m
- Concrete: 470 m3
- Armouring: 62 t
- Indicative performance: CHF 3.9 million