L 333, production of fillings with a stream laying between Pflegelberg and Primisweiler
- Remove topsoil and recycle: 2 100 m
- Loosen and recycle soil: 410 m
- Deliver building material (gravel 0/45): 2,800 m
- Deliver building material (gravel-sand mixture): 14,000 m
- Deliver building material (GU material): 1 125 m