Roads and sewer construction works (traffic facility construction and civil engineering):
The construction project is located in the southeast of the village of Waren (Müritz) and is located in a drinking water protection zone. Part of the construction project is the traffic and media development, including brine pipeline laying of the southern residential area of the development plan no. 24A "Papenberg II construction stage".
Gross amounts:
Part of the outdoor facilities:
60.000 m³ Bodenarbeiten
3.500 m³ ungeb. Tragschichtenmaterial
3.550 m² Asphaltfahrbahn
4.830 m² Betonpflaster
5.620 m Betonborde
875 m Pflasterrinne
Part Development:
10 pcs shaft structures up to DN1000
35 pcs shaft structures up to DN1500
375 m Druckwasserleitung DN180
1,700 m of sewer up to DN200
1,325 m storm sewer up to DN500
1,085 m gas pipeline up to d160
1,450 m drinking water pipeline up to d180
1 St Versickerungsbecken
1 St Regenwasserbehandlungsanlage
1 St Abwasserpumpwerk
4 pcs double transformer stations
3.100 m Kabelgraben