Heat exchanger Geb. 3 and others
“* Dates for performing the main performance on the construction site:
Service start 30.03.2022; performance end 01.07.2022
* Description of the procurement:
Installation of 10 heat exchanger stations with outputs from 45 to 300 kW each with pump, heat meter and fittings in existing pipeline networks”