Construction work | Tenderlake

Construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
24 March 2021
Closing Date:
05 May 2021
Location(s):
FRY40 La Réunion (FR FRANCE)
Description:
Public works contract - construction of a school group of 24 classes in the ZAC Avenir - relaunch

The purpose of this consultation is to carry out work for the construction of a school group of 24 classes on the ZAC Avenir - commune of Saint-Louis. This is a consultation revival following a declaration without follow-up.

Earthworks - VRD - soil treatment - outdoor furniture

- Preliminary activities,

- general earthworks,

- roads and ancillary works,

- sanitation of rainwater and wastewater,

- distribution of drinking water,

- watering,

- telephone network,

- fences.

Plumbing

Potable water:

- the implementation of drinking water networks from the AEP expectations of the VRD batch to the general shut-off valve,

- the implementation of the distribution networks up to the expectations of the EF Connections of sanitary appliances.

Wastewater / sewage:

- the implementation of wastewater and blackwater evacuation networks from sanitary devices to the lookouts of the VRD lot,

- the implementation of primary ventilation networks.

Sanitary devices:

- the installation of sanitary devices including accessibility devices for people with reduced mobility,

- the installation of floor drains and taps.

Fire protection:

- the implementation of regulatory safety displays,

- the use of fire extinguishers.

Watering:

- the implementation of AEP expectations for watering.

Synthesis cell:

- participation in synthesis units run by the Electricity unit.

Solar hot water

This lot must, in general:

Solar hot water centralized collective type:

- the implementation of solar collectors;

- the implementation of production balloons;

- the implementation of primary and secondary networks;

- implementation of cold water networks for filling the installation;

- implementation of the technical cabinet;

- the implementation of regulation equipment;

- the sizing of solar installations;

- the implementation of the supports and accessories necessary for the implementation of the installation;

- maintenance of these installations for one year from the date of receipt, including the supply of consumables (maintenance contract option).

Synthesis cell:

- participation in synthesis units run by the Electricity group.

Air conditioning - ventilation - food refrigeration

This lot must, in general:

Air conditioner:

- implementation of DRV type air conditioning systems (indoor and outdoor units);

- implementation of Split-System type air conditioning systems (indoor and outdoor units);

- the implementation of insulated refrigeration networks;

- the implementation of insulated condensate networks;

- the implementation of bus communication networks;

- the electrical connections from the protected waits left nearby by the Electricity lot;

- maintenance of these installations for one year from the date of receipt, including the supply of consumables (maintenance contract option).

Ventilation:

- the installation of ventilation boxes;

- the implementation of extractor hoods;

- the implementation of ventilation networks and accessories;

- the implementation of ventilation openings and expectations;

- the electrical connections from the protected waits left nearby by the Electricity lot;

- maintenance of these installations for one year from the date of receipt, including the supply of consumables (maintenance contract option).

Smoke extraction:

- the implementation of the smoke extractor;

- the implementation of smoke extraction networks and accessories;

- the implementation of smoke extraction vents;

- the electrical connections from the protected waits left nearby by the Electricity lot;

- maintenance of these installations for one year from the date of receipt, including the supply of consumables (maintenance contract option).

Food cold:

- implementation of cold production systems (indoor and outdoor units);

- the implementation of insulated refrigeration networks;

- the implementation of insulated condensate networks;

- the implementation of bus communication networks;

- the electrical connections from the protected waits left nearby by the Electricity lot;

- maintenance of these installations for one year from the date of receipt, including the supply of consumables (maintenance contract option).

Synthesis cell:

- participation in synthesis units run by the Electricity group.

Electricity

- the supply will include all the installations as described in these technical specifications;

- the supply, transport, handling, installation, assembly and adjustment of all devices, pipes, regulations necessary for the proper functioning of the installations;

- the power supply link from the external switch box, including the station terminal room to the main switchboard, including general connection circuit breaker + compact display;

- all the interior electrical installations from the station terminal room, including the equipment and lighting fixtures in accordance with the prescriptions of this CCTP;

Strong current installations including:

- the supply and installation of a general low voltage switchboard,

- the supply and installation of a general corrugated table,

- the main and secondary distribution networks,

- earth networks and equipotential circuit,

- interior electrical installations (lighting, sockets),

- security lighting (beaconing, anti-panic),

- ripple current distribution,

- outdoor lighting,

- power supplies (air conditioning, mechanical ventilation, etc.),

- cable and network trays on cable trays.

Low current installations including:

- the telephone and computer network,

- videophone,

- television distribution,

- technical alarm,

- intrusion alarm,

- the fire alarm system and its controls,

- videophone,

- the complete telephone wiring of the building from the connection point defined by France Telecom Summary of the fluid batches:

—— summary mission of fluid batches (air conditioning-ventilation, sanitary plumbing, electricity and elevator).

Elevator

- installation of a 630 kg lift, with on-board electrical machinery for access to the various buildings;

- the connection of electrical installations, telephone, technical alarm on expectations for electricity;

- the supply, transport, handling, installation, assembly and adjustment of all devices, pipes, regulations necessary for the proper functioning of the installations;

- storage, guarding and protection of equipment, materials and tools necessary for the reception of this lot, installed or not, and this until reception of the works;

- all locksmith supports (hot-dip galvanized steel) for fitting devices, pipes, ducts, etc.

- handling of all equipment and its protection during the work until reception;

- the installation of large equipment, including the necessary lifting means;

- the sealing and filling holes necessary for fixing devices and pipes.

Before acceptance, any cleaning resulting from the work for which it is responsible.

Painting - flexible coatings

The work of this lot includes the following services:

- the supply on the job of all materials and products necessary for the execution of the works;

- painting of the reference surfaces;

- the application of the products concerning the state of finish, the mat aspect, satin, gloss and the colors;

- work of layouts and recoating in the case of geometric decorations;

- the application of specific products and documents of the market concerning the state of finish, the matt, satin, glossy aspect and the colors;

- painting products comprising: preparatory coatings, paints, varnishes, stains, similar preparations of special products, surface water repellents;

- RPE thick plastic coating products and paneling for supermarkets;

- the fittings deemed necessary by the project manager, following the intervention of other trades, after completion of the painting work and preliminary costing;

- sweeping of supports and removal of waste;

- supply, installation, removal and removal of execution equipment;

- cleaning and removal of all waste and rubble resulting from this work.

Green spaces - plantations - watering

The works include the following services:

- the realization of the execution plans,

- the reception of the backdrops laid down by the VRD lot,

- cleaning and possible weeding of surfaces to be vegetated and decompacting after earthworks,

- finishing work on the form bases,

- staking and siting,

- work on disbursement and opening of planting pits,

- the supply and installation of the earthy mixture with amendments and green waste compost,

- the supply and planting of plants, including stakes and planting accessories,

- the installation of mulch,

- the take-back guarantee,

- maintenance for a period of one year.

The contractor will take all the necessary measures to: minimize the nuisance associated with the work, in particular dust, noise and the management of water from the site, guarantee the safety of people, guarantee the protection of the works.

Kitchen equipment

Are part of this contract:

- the supply will include all the installations as described in the CCTP:

—— the supply of equipment and accessories in accordance with the requirements of the CCTP;

—— installation of equipment and accessories;

—— the supply of civil engineering plans, including the exact position of the evacuation manholes, in the event that modifications should be made to the existing one;

—— the supply to the electricity company of the necessary powers and of the exact position of the expectations to be foreseen in the event that modifications should be made to the existing one;

—— connection to arrivals waiting for electricity;

—— the connection of its installations from the cold and hot water inlets left on standby by the plumbing package;

—— the connection of its installations to manholes and PVC pipes on hold;

—— rust protection and painting of all metal parts;

—— painting of pipes in conventional colors;

—— testing and commissioning of all kitchen equipment;

—— staff training.

Big work

The work of this lot includes the following services:

- contradictory acceptance of the platforms delivered by the VRD lot (levels, location and lift),

- studies and execution plans for the works,

- the reservation summary plans of the other trades,

- the layout and maintenance of the interior level line throughout the duration of the work,

- the installation and sealing of the metal frames in the sails during casting.

The carpentry lot will provide the Structural work lot with the location of the frames. In the event of poor installation or false plumb, the Structural work lot will take over the work at its expense: - the reservations required for other trades,

- the layout and execution of holes and seals,

- reservations or incorporation of sealing plates or boxes for metal structures,

- the layout of the building to be carried out by a surveyor approved by the contracting authority,

- the tests requested by the inspection office or by the project manager,

- the protection of its works during the duration of the works,

- the construction of the hoppers, the sealing of the sleeves, bolts and frames as well as all the works indicated before casting.

Hard coatings

The work of this lot includes the following services:

- contradictory reception of all kinds of media,

- studies and plans for the execution and identification of the structures,

- the summary plans of the other trades,

- protection of tiles on the floors throughout the duration of the works (with BIDIM or CTP).

Frame - roofing - cladding - wooden structure

The work of this lot includes the following services:

- the frame structure,

- breakdowns and bracing,

- covers,

- shoreline treatments,

- anticorrosion treatments and finishing paints.

Waterproofing - green roof terraces

The work of this lot includes the following services:

- contradictory acceptance of the works carried out by the Structural work lot (roof terrace, parapet, etc.),

- the realization of internal and external liquid seals,

- the realization of multi-layer waterproofing on flat roofs,

- studies and execution plans for the works,

- the tests requested by the inspection office or by the project manager,

- the protection of its works for the duration of the works.

Exterior wood furnishings

The work of this lot includes the following services:

- studies and detailed drawings of structures in conjunction with the various other trades, in particular with the shell lot,

- execution plans,

- adjustments, repair, protection of joinery during construction,

- the supply and installation of metal joinery,

- the caulking and various recoveries,

- fixing and assembly parts and subjugations, including adaptation parts.

Partitions - false ceilings - acoustic treatments

The work of this lot includes the following services:

- contradictory acceptance of the works carried out by the Structural work lot;

- studies, calculations, layouts, working and detailed drawings of structures, verification of the framework and materials chosen in accordance with regulatory requirements, in particular those relating to the risks of fire and panic, seismicity and contractual requirements for resistance, adaptation to the humidity of the premises and thermal and acoustic insulation;

- the implantation and / or the tracing of the development of the works in plates;

- the caulking in line with the crossings of the structures (filling, various caulking);

- notches, cutouts, etc., to receive lights, air vents and others;

- cleaning and removal of all waste and rubble resulting from its work.

Wood joinery

The work of this lot includes the following services:

- the verification of the existence of the level line which makes it possible to determine the leveling of the finished ground,

- supply and installation of door units,

- the supply and installation of accessories such as thresholds, joint covers, etc.,

- the constraints imposed by the requirements of other trades,

- cleaning and removal of all waste and rubble resulting from its work,

- the organization chart of the keys following joinery described in the articles below.

Ironwork

The service includes the following work, in a non-exhaustive way:

- studies and detailed drawings of structures in conjunction with the various other trades, in particular with the Structural work lot;

- execution plans;

- adjustments, repair, protection of joinery during construction;

- supply and installation of metal joinery;

- the caulking and various recoveries;

- fixing and assembly parts and subjugations, including adaptation parts.

Download full details as .pdf
The Buyer:
SPL Grand Sud
CPV Code(s):
09310000 - Electricity
39221000 - Kitchen equipment
44316510 - Blacksmiths' wares
45000000 - Construction work
45112500 - Earthmoving work
45232141 - Heating works
45261100 - Roof-framing work
45261210 - Roof-covering work
45261410 - Roof insulation work
45262311 - Concrete carcassing work
45262650 - Cladding works
45313100 - Lift installation work
45330000 - Plumbing and sanitary works
45331200 - Ventilation and air-conditioning installation work
45421000 - Joinery work
45421141 - Installation of partitioning
45431000 - Tiling work
45442100 - Painting work
77310000 - Planting and maintenance services of green areas