For the realization of new buildings and renovations of several engineering structures in the rack and pinion section on the route between Giswil and Kaiserstuhl, the Zentralbahn is looking for entrepreneurs. The tender for master builders and track construction is carried out separately.
The execution takes place in one stage.
The main works include:
-Renewal or rehabilitation of stream passage (2 pcs.)
-Replacement or new bridges (5 pcs.)
-New construction of retaining walls (4 pcs)
-Renovation of various retaining walls
-Sub- and superstructure renewal (1'720 m)
-Entwässerungsleitungen (ca. 1'800 m)
-Cable duct/cable duct block (approx. 1'750 m)
-Cable shafts (approx. 15 pcs.)
Main amounts:
-Bored piles d=90 cm; total 120 m
-Concrete 1'200m3
-Gravel 4'000 m3
-Zahnstangengleis 1’720 m
-Repair of retaining walls (joint renovations) 1'200 m2
-New retaining walls 360 m2
Particularities:
-Contact wire available during the entire construction period (height limit for vehicles used)
-Streckengefälle
-Requirements for locomotive personnel
For the realization of new buildings and renovations of several engineering structures in the rack and pinion section on the route between Giswil and Kaiserstuhl, the Zentralbahn is looking for entrepreneurs. The tender for master builders and track construction is carried out separately.
The execution takes place in one stage.
The main works include:
-Renewal or rehabilitation of stream passage (2 pcs.)
-Replacement or new bridges (5 pcs.)
-New construction of retaining walls (4 pcs)
-Renovation of various retaining walls
-Sub- and superstructure renewal (1'720 m)
-Entwässerungsleitungen (ca. 1'800 m)
-Cable duct/cable duct block (approx. 1'750 m)
-Cable shafts (approx. 15 pcs.)
Main amounts:
-Bored piles d=90 cm; total 120 m
-Concrete 1'200m3
-Gravel 4'000 m3
-Zahnstangengleis 1’720 m
-Repair of retaining walls (joint renovations) 1'200 m2
-New retaining walls 360 m2
Particularities:
-Contact wire available during the entire construction period (height limit for vehicles used)
-Streckengefälle
-Requirements for locomotive personnel