Reconstruction of a park with a new youth playground, paths and squares, earthworks with KBE dam, vegetation works, tree planting and equipment as well as lighting. The park is located on a contaminated site.
Peel off approx. 6,760 m2 of turf, remove topsoil, screen approx. 690 m3 of topsoil-turf mixture, mill approx. 750 m2 of turf, break off approx. 3,250 m2 of composite pavement incl. edge stone, break off approx. 320 m2 bituminous pavement, break off approx. 35 m2 of small stone pavement, demolish various fittings and fixtures, clear approx. 40 trees incl. root system, clear approx. 70 root stumps of trees that have already been felled, Clearing approx. 2,910 m2 of woody areas including roots, approx. 780 m2 of roots of cleared woody areas, supply and install approx. 1,670 m3 of infill soil, Deliver and install approx. 4,950 m2 of geotextile, approx. 9,550 m2 of soil reinforcement Geogrid 30/30, 40/40, 55/20 kN/m, approx. 1,290 m3 frost protection material RC ballast 0/45, approx. 990 m3 base course RC ballast 0/45, approx. 535 m3 base course N-ballast 0/32, approx. 1,980 m3 foam glass ballast, approx. 11 m settlement level for KBE dam, approx. 72 pcs carry out deformation measurements, approx. 200 pcs Front lattice elements, approx. 2,675 m2 concrete pavement, various formats, approx. 1,550 m Deep concrete curbs, approx. 336 m Concrete seating blocks, approx. 42 m Concrete edging slabs, approx. 23 m2 Granite small stone pavement, approx. 40 m2 Decorative gravel 16/32, approx. 1,200 m2 sports surface EPDM, approx. 400 m2 fall protection surface EPDM, approx. 150 m2 fall protection sand, approx. 1 pc Road drainage, approx. 5 m2 stone setting Water stones, approx. 2,000 m3 topsoil Z0 supply and cover, approx. 280 m2 sowing gravel lawn, approx. 7,100 m2 seeding landscape lawn, approx. 5,700 m2 seeding meadow areas, approx. 1,500 m2 supply and laying of finished turf, supply and plant approx. 1,230 m2 of shrub areas, approx. 5 pcs supply and plant solitary shrubs, approx. 12 pcs deliver and plant trees and solitaires, - Completion care + 1 year of development care, for trees/solitaires 2 years of development care, approx. 1 pc Individual seating object, approx. 2 pcs Football field goals with basketball structure, approx. 2 pcs Volleyball facilities, approx. 1 pc Fitness combination, approx. 5 pcs other play and sports equipment, approx. 5 pcs Seat platforms steel/wood construction, approx. 8 pcs Park benches, approx. 8 pcs Waste bins steel fvz, coated, approx. 5 pcs Information signs, approx. 9 pcs Information signs, barrier-free, approx. 2 pcs Overview boards, barrier-free, approx. 1 pc Weather protection mushroom, approx. 64 m Ball stop fence H=4 m, approx. 160 m Grounding cables, approx. 54 m Stair nosing profile, approx. 87 m railing, steel construction, approx. 15 Pole-top luminaires, approx. 5 pcs Light pole fuse box, approx. 2 pcs Supply bollards, approx. 1,260 m of electrical cables, - Black-and-white system according to work and safety plan set up, maintain, clear,