The market Regenstauf is planning the new construction of the children's house in Steinsberg. Two crèches and two kindergarten groups will be set up, whereby the possibility of expanding the kindergarten up to a maximum of 4 groups must be taken into account.
,
The basic services of work phases 3 - 9 for building and interior design in accordance with Section 34 Paragraph 3 HOAI 2021, Part 3 Section 1, as well as the special contribution of participation in the application for and billing of subsidies (including proof of use) as well as monitoring are awarded by means of the step-by-step assignment the removal of defects within the limitation period.
The market Regenstauf is planning the new construction of the children's house in Steinsberg. Two crèches and two kindergarten groups will be set up, whereby the possibility of expanding the kindergarten up to a maximum of 4 groups must be taken into account.
,
According to current cost estimates, the total costs (KG 200-700) amount to EUR 5,338,110.88 (gross). A plot of land in Steinsberg is available for the new building, although in the outdoor area, the buildability or the possibility of the planned children's house has already been clarified with the district office.
,
The planning services are to be awarded in spring 2022. The planning (input planning) should then be completed by summer 2022 at the latest so that construction can start as quickly as possible and the project is completed and ready for occupancy by autumn 2023 at the latest.
,
The basic services of work phases 3 - 9 for building and interior design in accordance with Section 34 Paragraph 3 HOAI 2021, Part 3 Section 1, as well as the special contribution of participation in the application for and billing of subsidies (including proof of use) as well as monitoring are awarded by means of the step-by-step assignment the removal of defects within the limitation period.
,
Level 1: Lph 3 (shortened to 5% points) and 4
,
(After a feasibility study including cost estimation and parts of a design plan has already been available, Lph. 3 is commissioned with 5% points.)
,
Level 2: Lph 5, 6 and 7 (Lph 7th reduced to 3%)
,
(Since the delivery of the course is taken over by the client, the Lph 7 is reduced to 3%.)
,
Level 3: Lph. 8 and 9
,
Funding is to be applied for, and corresponding help from the architect is expected (see special services).